Rooftop solar on a detached house is a conversation between you, an installer and your wires company. In a condo or townhouse there is a fourth voice: your condominium corporation. Whether you can install panels, and how, depends on what you own, and that is written in your condominium plan and bylaws.
The short answer: in a bare land condo, which is common for townhouse and duplex complexes, you usually own the roof, so solar works much like a detached home, although your bylaws may still require board approval. In a conventional condo the roof is common property, so you need the corporation’s written permission, or the corporation installs a shared system to cut common-area power costs. Either way, you need your own meter and site ID to be credited for the power you export.
Step 1: Find Out What You Actually Own
Alberta’s Condominium Property Act recognizes two kinds of units. A conventional unit is a space inside a building, described by its floors, walls and ceilings. A bare land unit is a piece of land. Everything outside the units is common property, which the corporation controls and maintains.
That difference decides who controls the roof. The province’s Owning a Condominium guide puts it plainly: in a bare land unit “you own the actual land and anything built on it. Usually the exterior walls, the roof, the foundation, driveway and at least part of the landscaping are part of the condominium unit.” Bylaws can shift that maintenance to the corporation.
| Home type | What your unit is | Who controls the roof | Usual path to solar |
|---|---|---|---|
| Bare land condo (many townhouse and duplex complexes) | The land and what is built on it | Usually you, unless bylaws make it the corporation’s responsibility | Owner-led, with board sign-off if bylaws regulate exterior changes |
| Conventional townhouse condo | The space inside your walls, floors and ceilings | The corporation (common property) | Written permission or agreement from the corporation, sometimes a bylaw change |
| Apartment-style condo | The space inside your suite | The corporation (common property) | A building-wide system on the corporation’s common-area meter |
| Freehold (non-condo) townhouse | Your lot and house | You | Like a detached home, subject to permits and any restrictive covenants on title |
Not sure which you have? Ask your condo manager for the condominium plan and bylaws.
Step 2: Read Your Bylaws Before You Call an Installer
Every owner is bound by the bylaws. Before you collect quotes, look for:
- Exterior rules. Many complexes require approval for anything visible from outside, even on a bare land unit.
- Managed property clauses. If the corporation maintains roofs, drilling into yours affects it.
- Roof warranty terms. Unapproved penetrations can void a roofing warranty.
- Solar itself. Newer bylaws sometimes address it; older ones are usually silent.
If the bylaws need to change, that takes a special resolution: a vote of at least 75% of owners who together hold at least 75% of the unit factors, and the change takes effect only once it is filed with Land Titles. Most single-owner requests go through a written agreement instead.
Step 3: Get the Right Kind of Permission, in Writing
For a conventional unit, a verbal “sure” from a board member is not enough. Section 50 of the Act lets a corporation grant an owner exclusive possession of an area of common property through a bylaw, lease, licence or other instrument, and it can require that owner to maintain and repair the area. If the owner doesn’t, the corporation can do the work and recover reasonable costs.
Written permission also matters for your micro-generation application. Alberta’s Micro-generation Regulation requires a system to supply a site on property the customer owns or leases, and to be located on that property or on adjacent property the customer owns or leases. A clear agreement for the roof area is how you show you have the right to use it. Have a condo lawyer review the wording; this guide is not legal advice.
What to include in your proposal to the board
- A layout drawing, plus the mounting method and a roofer’s confirmation that the roof warranty survives.
- A structural opinion for older buildings or ballasted systems.
- The conduit route, and whether it crosses common walls, attics or a neighbour’s unit.
- Who pays to remove and reinstall the panels at re-roofing, and who handles snow sliding onto walkways.
- The installer’s liability insurance, and what happens to the agreement when you sell.
Our installer checklist will help you find one who has done condo work.
Time It With the Roof and the Reserve Fund
Panels last 25 years or more, so they should go on a roof with plenty of life left. Canada’s solar and roofing associations both point to a roof covering under 10 years old, or with more than 10 years of service life remaining. Our guide is my roof ready for solar? covers the warning signs.
Condos have an advantage: every Alberta condominium corporation must commission a reserve fund study at least every five years, looking ahead at least 30 years and estimating when components such as roofs will need replacing. If the latest study shows your roof is due within a few years, install right after it is redone, or agree up front how the remove-and-reinstall cost is shared.
Meters, Site IDs and Your Wires Company
Alberta credits exported solar power to a site: the regulation defines it as a customer’s unique end-use service delivery point for electricity. In practice that means your own meter and your own 13-digit site ID, which appears on your bill. Our guide to finding your site ID shows where.
- Most townhouses are individually metered, so each owner can be a micro-generator.
- Some buildings bill suites through a bulk meter. Without your own site, a building-wide system is the practical route.
- Your wires company must be notified before you connect, and it installs a bi-directional meter. Find yours in who is my wires company?
- Size to your own use. The regulation requires a micro-generation system to be intended to meet all or part of your annual consumption, and its capacity can’t exceed your electrical service rating. Our sizing guide walks through the math.
Once connected, exports are credited under Alberta’s micro-generation rules, explained in our micro-generation credit guide.
Insurance: Check Two Policies, Not One
In a building-style condo, the Act requires the corporation to insure the units and common property, but not improvements owners make to their units unless the bylaws require it. In a bare land condo, the corporation insures the common property, and the house is generally yours to insure. The province’s guide reminds owners to buy their own coverage for improvements. Panels you add are likely your improvement, so tell your insurer and ask the manager how the building policy treats them. Ask about hail first; see our solar hail and insurance guide.
Apartment-Style Condos: A Shared System for Common Power
In an apartment-style building, the better option is usually one array owned by the corporation on its own meter, offsetting power for hallway lighting, parkades, elevators and ventilation. Every owner benefits through the operating budget.
- The corporation is the customer on its common-area meter, so it is the micro-generator.
- Several meters can sometimes be combined. The regulation allows “aggregated sites”: two or more sites owned or leased by the same customer, on the same distribution feeder, with the same retailer and the same rate.
- Funding needs a plan. The Canadian Condominium Institute’s condo solar guide notes that panels are likely a capital improvement, and depending on how they are paid for (operating budget, special levy, reserve fund or a loan) an owners’ resolution may be needed.
Get Energy supplies electricity and natural gas to condo corporations and property managers across Alberta; see our page for property managers and multi-unit buildings.
Once You Are Connected: What Your Exports Earn
If your unit has its own site and you become a micro-generator, what your solar is worth depends on your electricity plan, because under Alberta’s micro-generation rules the power you send to the grid is credited at your plan’s energy rate for that period.
The Solar Club® is a loyalty program for Alberta solar micro-generators from UTILITYnet (Utility Network & Partners Inc.); Get Energy offers it as a partner retailer. Members are on one of two Solar Club® rates: the HI Rate, for periods when you export more than you import, and the LO Rate, for periods when you import more than you export. On the LO side you choose either the fixed LO Rate or the variable rate. Whichever rate you are on applies to both the power you import and the power you export in that period. With RateSwitch™ turned on, you are moved between HI and LO automatically whenever your Pre-Bill™ data shows your net status flip between importer and exporter, so there is nothing to time yourself. Rates change, so this guide doesn’t list them: see the current HI and LO Rates or the Solar Club® page.
With Get Energy, your Solar Club® export credits carry forward on your account. Once your credit balance reaches $200 we pay it out, or, if you prefer, we can pay out monthly, or leave the credit on your account to cover your winter bills. To see how the Solar Club® compares with other options, read our solar export rate comparison.
Work Out Your Own Payback
We don’t print a payback figure here, because it depends on electricity rates and rates change. The math is simple; for planning, a south-facing Alberta system makes roughly 1,150 kWh per kW of panels a year.
- Annual value = (kWh you use at home × your all-in energy rate) + (kWh you export × your plan’s rate for that period)
- Simple payback in years = installed cost (including legal review, any structural work and your share of a future remove-and-reinstall) ÷ annual value
Plug in today’s figures from our rates page, and see are solar panels worth it in Alberta? and the Alberta solar panel cost guide for a longer walk-through.
Your Condo Solar Checklist
- Get your condominium plan and bylaws, and confirm whether you have a bare land or conventional unit.
- Check the bylaws for exterior-change rules, managed property clauses and roof warranty terms.
- Confirm you have your own meter and site ID.
- Ask for the latest reserve fund study and find out when your roof is due for replacement.
- Get two or three quotes from installers who have done condo or townhouse work.
- Submit a complete proposal to the board, and put the approval in writing, reviewed by a condo lawyer.
- Call your insurer, then let the installer handle permits and the wires-company notice.
Frequently Asked Questions
Can I put solar panels on my condo in Alberta?
Often, yes, but how depends on what you own. In a bare land condo the roof is usually part of your unit, so solar works much like a detached home, subject to your bylaws. In a conventional condo the roof is common property, so you need the condominium corporation's written permission, or the corporation installs a shared system for common-area power.
Do I need condo board approval for solar panels on my townhouse?
If your townhouse is a conventional condo unit, yes, because the roof is common property. If it is a bare land unit you usually own the roof, but many bylaws still require board approval for exterior changes. Read your bylaws and condominium plan before you request quotes.
What vote does a condo corporation need to allow solar panels?
It depends on how the permission is given. Under Alberta's Condominium Property Act, changing a bylaw takes a special resolution: at least 75% of owners representing at least 75% of the unit factors. A corporation can also grant exclusive use of part of the common property through a bylaw, lease or licence. Ask your condo manager or a condo lawyer which route applies.
Who pays to remove solar panels when the condo roof is replaced?
Whoever your written agreement says pays. Removing and reinstalling an array is a real cost, so settle it before installation. Many owners time the install for just after a scheduled re-roof, which the corporation's reserve fund study should show.
Can I get solar export credits without my own electricity meter?
Not at the unit level. Alberta's micro-generation rules tie generation to a customer's site, which is a unique service delivery point with its own site ID. If your suite is billed through a shared or bulk meter, a building-wide system on the corporation's meter is the usual route.
Next Steps
Your condominium plan, bylaws and reserve fund study answer most questions before an installer visits. City guides for Calgary, Edmonton and Airdrie cover local costs and permits.
Once your panels are connected, your electricity plan decides what your exports earn. See how the Solar Club® works for solar homes, check the current rates, and sign up online in a few minutes. There is no cancellation fee, and you can keep your installer and equipment.
Solar Club® is a loyalty program of Utility Network & Partners Inc. (UTILITYnet); Get Energy is a partner retailer and a tradename of Utility Network & Partners Inc. Rates change: see current rates. This guide is general information, not legal advice; check your own condominium plan and bylaws and have a condo lawyer review any agreement with your corporation.